Recent Projects

Installation University of Auckland

Principal: Fletcher Construction
Electrical: Singer Electrical

MSS was engaged on this project in the later stages to assist Singer electrical in meeting designated floor completion dates. Four main floors of installation were undertaken and a number of plant rooms. Completion of these floors was achieved within the contracted time frames.

Installation Wellington Hospital

Principal: Fletcher Construction
Electrical: Newpowerr Electrical


MSS undertook a six month subcontract with NewPower electrical Wellington for the installation of cable supports.Our team of fitter's were relocated to Wellington for this project and were set challenging time frames to help Newpower achieve level sign off on four main floors and a number of plant rooms. Actual time gain of four weeks was achieved by MSS in this project and within our contracted installation price.

Installation International Airport

Principal: Hawkinsr Construction
Electrical: Dickinson Gray Electrical

MSS has just come off contract at the Auckland international expansions pier 3B the follow on project to the pier 3A completed. These projects have seen in excess of 12,000 meters of single and multiple stack electrical trays and supports installed by MSS crews. Another challenging project for our team with high levels of finish and detailed runs being required. We are proud to promote exceptional gains in actual installation time on this contract again realizing time and cost benefits for our principal electrical client.